Mfg · Layout 15

OEE and line stability

Overall equipment effectiveness, downtime reasons, scrap, and shift output versus target.

Line B · Assembly
Quick actions
MES link OK Safety rounds 2/3
PM due this week

6

Schedule
Energy / unit

3.2 kWh

↓ 4%
Headcount on line

48

Shift B
Rework lots

2

Hold B-220
Cycle time

42s

Target 45s
Scrap $ (shift)

$1.8k

Under cap
OEE

81%

World class target 85%

Downtime (min)
Scrap rate

1.8%

Below 2.0% cap


  • P1 Tool wear cell 3
  • P2 Feeder jam lot 44
Output vs target (units / hr)
Shift handover notes
Shift A 06:00

Calibrated station 2; left spare belt in cage.

Shift B 14:00

QA hold on batch B-220 until tensile retest.

All Rights Reserved 2026 - 2030